Vapor Recovery
|
Gas Master V.R. / Individual Well Units
are specifically designed to meet all of your production needs. Units are available
in H.P. ranges from 10 to 50, with or without integrated inlet separators, with
automated pumps. Production Systems uses only the highest quality LeRoi
screws to bring you the most innovative, effecient and durable units on the market.
The packages are capable of inlet pressures of 25" Hg, at discharge pressures
of 100 psig Gas Master V.R. units are designed, manufactured and serviced
by Production Systems. |
 |
 |
 |
|
|
CAPABILITIES
- Up to 1000 psig standard, higher pressures available Up to 75HP
- 1,2 and 3 stage units available
- Flows to 500 SCFM limited by HP
-
Gases including Nitrogen, Argon, Helium, Natural Gas, Carbon Dioxide, LPG, Sulfur
Hexaflouride, refrigerant gases, landfill reclamation gases, and many other compressible
gases.
BENEFITS
- MODULAR DESIGN: allows for interchangeability of bore sizes and
strokes, giving a wide range of capabilities with limited expense
- Compressor seals designed to positively contain harmful gases
- Six different Piston Ring and Gas Packing materials are available for specific gas
applications
- Air and water cooling available
- Pressure lubricated lower end for long bearing life, utilizing oversized bearings
- Oil-Free upper end prevents the addition of oil vapor to the gas stream and subsequent
cleanup & removal
- Vertical crosshead design ensures oil free compression, and removes side thrust
from piston rings for longer ring life
- Oversized intercoolers on multi-stage units ensure cool gas to the second and third
stage
- Thick cast iron cylinders and heads decrease warpage and provide vibration dampening
- Large, low lift stainless steel valves give longer life and higher efficiencies,
and are quickly accessible without removing the cylinder head
- Gas Packings are full floating segmented type, for extra long life and positive
sealing
- Piston rings are of extra thick, engineered polymers designed for specific applications
- Units are fully tested at the factory with minimum four hour test time, including
testing at customer specific conditions
|
|
|
|